Page 8 of 102

Staying warm at higher gas prices

With gas prices hitting £4 a therm and the price cap at 70p a therm you might be wondering how you can improve the insulation of your home in Strathbungo. Loco Home Retrofit CIC is a new local community benefit co-op who are trying to help communities insulate.

Their launch event is at 19:30 on Wednesday 1st December https://bit.ly/loco_launch

The Strathbungo Eco Group is excited about working with Loco Home Retrofit to achieve transformative improvements in insulation and energy in Strathbungo while preserving and maintaining our wonderful architecture.

Disclaimer: In their formative stages Loco Home Retrofit have helped Strathbungo Eco Group with information events and informal advice. Various Eco Group members have benefited from professional advice (sometimes at a discount). Tom Nockolds, a Director of Loco Home Retrofit, is also a Strathbungo Eco Group and Strathbungo Society Committee member.

LocoHomeRetrofit.jpg

Strathbungo Celebrates!

A report on our recent celebration of 50 years by our Chair, Jane Carolan:

Tuesday 16th November saw a crowded Queens Park Hall celebrate the fiftieth anniversary of the Strathbungo Society in style .

The meeting began with the AGM, where the reports and the accounts of the Society were approved and the current office-bearers: Chair Jane Carolan, Vice Chair Paola Rezzilli and Treasurer Steven Good were re-elected. The formal proceedings were completed by the election of a new committee, blending a mixture of old members returning with several new volunteers from the meeting. However a number of people approached me as chair afterwards and suggested that they were considering joining the committee. There are always spaces for new volunteers and anyone wishing to participate should email me at chair@strathbungo.co.uk.

One office-bearer stood down: our secretary, Sharon. A stalwart of the Strathbungo Society for over twenty five years, Sharon spent many years as the editor, contributor and general whipper-in of our newsletter, keeping it afloat. She also played a major part in the development of Bungo in the Back Lanes from its very early days. Her back garden has provided food and hospitality during our halcyon warm June Bungo days and a refuge from the rain when the weather looked not so kindly on us. Her “retirement” was marked by a presentation from the Society, but is not expected to lessen her contribution to our events .

Sharon’s departure leaves a gap on the committee for the position of secretary and, as in the appeal for committee members, anyone thinking that they could make a contribution can contact the same email address given above.

The event moved on to a cheese and wine celebration, where the new Strathbungo Handbook was launched, with an introduction from the formidable Andrew Greig, whose knowledge of the local architecture and history proved fascinating. Thanks are due to Sharon and to Paola who, with their associates, put together the new handbook.

Watch this space for how to obtain your copy of this publication, telling you everything you ever wanted to know about your local area, or email sales@strathbungo.co.uk for details.

Imminent Network Rail works

We have received the following notification of works this weekend and next week through the local community council and Cllr MacLeod:

Please see below works scheduled in the Strathbungo area that will be undertaken by BAM Nuttall:

  • We will be undertaking ground investigation works at Nithsdale Road bridge on Sat 20th (night shift) and from Mon 22nd – Fri 26th (day shifts).
  • During the single night shift on Saturday 20th and Monday 22nd dayshift, work will involve digging trial holes using a power unit and generator that will be situated on the railway under the bridge. We anticipate a medium level of noise created from the generator, however, please note we have arranged for acoustic sound barriers to mitigate this as much as possible.
  • Dayshift work from Mon 22nd – Fri 26th will be very low impact, with no traffic management or restrictions to the public.
  • All works planned are planned for completion on Fri 26th November 2021.

Should you have any questions or concerns, please contact Network Rail using their 24-hour helpline on 03457 11 41 41 or via their website at www.networkrail.co.uk/contactus.

The Strathbungo Handbook

After a marvellously busy AGM and book launch last night, we can present to you The Strathbungo Handbook.

We have published this for our 50th anniversary and it is now on sale for £5. All the proceeds will go towards the Society’s events. It’s 32 gorgeous pages of eye-opening stories of the area, amazing photographs, a walking tour and a wonderfully illustrated pull out map. So if you want one as a souvenir or a fantastic Christmas present drop an email to sales@strathbungo.co.uk; we take PayPal, or cash or card on collection.

If you weren’t there last night, you will have missed Andrew Greg (No. 1 Moray Place) launching the book with a fantastic talk about all things Strathbungo, the 15 Minute Neighbourhood and thoughts of how we can make the area more environmentally viable (also in the book).

A huge thank you to all who came to the AGM last night. The Society can’t do the work we do without you. Thanks also to those who offered to join in the work. If you are also interested, come along to one of our meetings in the den at The Bungo on Nothsdale Road; there’s a social meeting on 14 December, and a back to business meeting on 18 January 2022. You don’t need to tell us in advance. See our calendar of events.

Moray Place greenery

A plea has been received by the Society for householders along Moray Place to manage and maintain the foliage and growth on the roadside of the black fence at the railway.

You may recall that Moray Place owners also own up to 1 metre of the ground at the railway side of the road. While this helped us argue for a set-back fence (and a good outcome on the long railings debate with Network Rail), it also means that the Moray Place owners are responsible for maintaining the shrubbery, plants and trees at the roadside, rather than the Council.

As a somewhat frustrated resident told us:

I am out every week cutting back large overhanging branches as well as sweeping and maintaining, not only my area but our whole block.

Many of the residents have said that they had no idea they had to maintain/sweep the areas in front of their own house. The Council no longer sweep Moray Place.

There has been an abundance of damaged cars recently due to vans and other traffic avoiding the railway side and veering towards the residents’ cars.

It would be helpful to all if Moray Place owners would take action to ensure the far side of the road does not restrict drivers and other users of Moray Place.

Autumn 2021 Newsletter

The latest newsletter has arrived. If it hasn’t made it through your door already, you can

Read it now!

New Bridge, NOT Brighter Bungo, New Bawn, a New Book, News in Brief…

And a very warm welcome to our new editor, Sandra Nimako-Boatey. Thanks also to James Spooner for his stint; he gets a well deserved rest.

You can also find the newsletter, and old ones back to the 1990s, at the BygoneBungo Newsletter Archive.

Strathbungo AGM and our big birthday – we’re 50!

AGM details

The Strathbungo Society AGM will be held on 16th November 2021.

Where: in the Hall at Queens Park Church of Scotland, 170 Queens Drive
When: Tuesday 16th November at 7pm

Agenda:

The required business of the AGM is first:

  • Approval of Minutes 2020
  • Chair’s Annual Report
  • Financial report of Accounts
  • Election of the management committee

Followed by other items of local interest:

  • Report of the East Kilbride line electrification
  • Bin & cleansing issues

If there are any other issues you wish to raise, please contact the chair at chair@strathbungo.co.uk by October 15th.

Papers in advance:

The Trustees of the Strathbungo Society have published our draft Annual Report and Accounts 2020-21 and draft minutes of last year’s AGM. The meeting is asked to consider and then approve the Annual Report and Accounts before they are submitted to the Office of the Scottish Charity Regulator. They will appear on the AGM Minutes page in due course.

The Annual Report gives an indication of what the Society has been doing and achieved over the last year (up to 30th April 2021), despite the pandemic.  Do please take a couple of minutes to read it – hopefully it will inspire people to get involved in whatever way they can!

If you have questions on either the Annual Report or the Accounts and are unable to attend the AGM, do please contact the Treasurer by email.

Our big birthday!

We will also be celebrating as the Society will be 50 this year. The AGM will be followed by the launch of a new publication on the history of the Society and Strathbungo, with cheese and wine.

We hope to see you there…

Please come along, hear about our past and our future, and support the work we do. New blood on the committee is always welcome too!

Bins!

I chatted with the guy emptying our bins this morning (doing it all by himself!), and he said the Council and unions are in discussions about the bin lorries not going down the back lanes from the end of September!!! He had no idea what arrangements would be put in place instead. Has anyone else heard anything like this? Has the Society got a contact in the Council to check this out? 😩

Society Update 21 Sep 2021

We made some enquiries. The following statement has been received from the City Council.

“We are currently reviewing all collection routes across the city, particular attention will be given to properties where the bins are presented to lanes.

This is to assess the bin presentation areas to confirm they are safe for our refuse vehicles and staff. Where issues are identified, control measures will be put in place to reduce the risks.

These measures could be advising residents to present their bins to the end of the lane or at the front of the property.

As yet there has been no decision made however once recommendations have been made, we will consider the alternatives and engage with elected members and residents affected before any changes are implemented.”

The Strathbungo Society has asked what assessments have been made of the hazards that this will produce, particularly in the Squares, with their narrow width and parking hazards, or how the measures will affect elderly or disabled residents. We await a council response.

It is also worth noting this issue has been raised by the council several times over the last 20 years, but nothing has yet come of it.

Society Update 6 Oct 2021

A further clarification was sent by the Council to the Society:

What I mean is that there are assessments done city wide, whenever required. This could be due to the change in the conditions of a lane, resulting in it not being accessible for the workforce. Possibly the underfoot conditions have become slippery, very uneven or inaccessible due to overgrown foliage etc. These are a few examples of why the assessment would be carried out. This does not mean that the service would be withdrawn. It may mean that work is required to ensure the health and safety of our teams. If there is a concern raised by a team, the area would be assessed an relevant information would be passed to whoever it relates to. I do not have any timelines on this as yet. When I say “each property is assessed on its own right” I mean each lane is assessed in its own right and any remedial works needed would be the responsibility of the residents/ owners in each property with a share of ownership of that lane.

The Society has invited a Council representative to the AGM on 16 November 2021.

A new bridge is coming – but where?

Network Rail (NR) have announced that the public consultation on a new footbridge for Strathbungo has decided in favour of design A, which nods to the design of the current bridge and allows Strathbungo residents to maintain the fine old tradition of waving at the trains.

shows new bridge

However,  we still don’t know where the bridge is to be situated. The local consensus appears to be that the bridge be re-sited at the end of Marywood Square, where one existed until the end of the 1990s.

The Society met with Network Rail in early August to discuss this and associated issues of the road bridge on Nithsdale Road, where Susie’s still stands, though not for much longer (demolition is scheduled for early 2022). Network Rail have a deadline of 2023 to get electric trains on the tracks.  This means all timescales are tight but it seems much has still to be determined.

Moving the footbridge was raised and their engineering spokesperson said that he had done a location visit at Queens Square but had not investigated  the original site of the Marywood Square bridge, which seems odd! There seemed little resistance in principle to the idea of re-locating the new footbridge but the feasibility is in question. Where the engineer investigated at Queens Square, they felt there was no safe pedestrian access to it, as it is sited on a semi-chicane T-junction with narrow pavements on the Moray Place side at the Queens Square junction. NR believed that the same would apply at the top of Marywood Square. However this is not the case. Where the previous  bridge landed at Marywood, the infrastructure is intact with a pavement as wide as at  the existing bridge, but considerably longer and with the advantage of overhead lighting. It also provides safer access to Pollokshields, in that this site is nearer the pedestrian crossing across Darnley Road.

Questions were also asked about the road bridge at Nithsdale Road. Given the state of the bridge, it is not surprising that it is to be replaced but the new  road bridge will replace the deck only – not the superstructure at either end that holds it up – and  will remove the ‘temporary’ props under the bridge. The  new deck will be thinner from top to bottom than the present to raise the clearance. There was also discussion about the replacement parapets, ensuring that they are suitable in a conservation area .

For the Society, there are major concerns about how the new road bridge will be configured . Currently it is a  two-lane road,  one in either direction, due to weight restrictions. However, with new commitments by the Council to active travel, we are keen to enter into discussions with them about the road design. It will also be important to have a footbridge before the road works start, or crossing the railway will have to be done via Titwood Road or Albert Drive. As things stand, we are seeking the urgent engagement of council officials in the Planning and Roads departments to seek solutions that suit the Strathbungo area .

« Older posts Newer posts »